Dustbin Heater
Availability :
In stock
Dustbin Heater
This propane dustbin heater is perfect for heating warehouses, small factories and for drying out buildings.
| Size | 24 Hour Rate | 2 Day Rate | Week Rate |
|---|---|---|---|
| £33.00 | £44.00 | £55.00 |
SKU: GMAC0009-1-4-2-1-1-1-1-1-1-1-1-2-1
Category: Heating & Lightning
Tags: blow heater, construction, construction equipment hire, heater, heating, safety working, Wall
- Automatic piezo ignition
- Double skinned top to reduce surface temperature while burning
- Supplied with hose and regulator assembly
- N.B. This heater runs on propane gas alone, no mains power required.
Be the first to review “Dustbin Heater” Cancel reply
Related Products
Acrow Prop
£3.50
Props are designed to support a wide range of temporary floors and beams, available in; Size 0 (1.04m – 1.83m) Size 1 (1.75m – 3.12m) Size 2 (1.98m – 3.35m) Size 3 (2.59m – 3.96m) Size 24 Hour Rate 2 Day Rate Week Rate £13...
2.5 Tonne Excavator
2.5 Tonne Excavator The TB225 compact mini excavator is a legally towable 2.5 tonne alternative when using a typical 3.5 tonne trailer. Maximum Digger Depth (2580mm) Retractable Track Frame from 1,100 to 1,500 mm for excellent working stability. Attachment Ready - Features two way auxiliary...
Barrier Fencing
£2.75
Whatever your containment needs, our Barrier Fencing is flexible, effective and perfect for any project. Length 2.2M Height 1.2M Size 24 Hour Rate 2 Day Rate 3 Day Rate Week Rate Weekend Rate Minimum Weekly Charge £2.75
3 Tonne Excavator
3 Tonne Excavator The TB230 Compact Excavator offers operators a powerful operating performance. Offering the largest cab on a 3-tonne weight class excavator, equivalent to a 6-tonne cab size. Maximum Digger Depth (2835mm) Attachment Ready - Features two way auxiliary hydraulics with isolation shut-off valves....
Scaffold Board
£75.00
Scaffold Board Various length Scaffold Boards in popular sizes: 2.5m 3m 3.5m Size 24 Hour Rate 2 Day Rate Week Rate £13 £18 £23
Strongboy
Strongboy A Strongboy is a steel support insert to be used in conjunction with steel props. Will act as a support for upper brickwork prior to the removal of lower brickwork. To install simply hammer into a mortar joint. Size 24 Hour Rate 2 Day...

Reviews