Dustbin Heater
Availability :
In stock
Dustbin Heater
This propane dustbin heater is perfect for heating warehouses, small factories and for drying out buildings.
Size | 24 Hour Rate | 2 Day Rate | Week Rate |
---|---|---|---|
£33.00 | £44.00 | £55.00 |
SKU: GMAC0009-1-4-2-1-1-1-1-1-1-1-1-2-1
Category: Heating & Lightning
Tags: blow heater, construction, construction equipment hire, heater, heating, safety working, Wall
- Automatic piezo ignition
- Double skinned top to reduce surface temperature while burning
- Supplied with hose and regulator assembly
- N.B. This heater runs on propane gas alone, no mains power required.
Be the first to review “Dustbin Heater” Cancel reply
Related Products
Tracked Dumper
Tracked Dumper This compact Track Dumper has a maximum width of 750mm and a length of 1900mm.It can turn on its own length offering greater accessibility and manoeuvrability in urban areas or areas where the larger plant cannot gain access. Complete with hi tipping capacity...
6 Tonne Excavator
6 Tonne Excavator The TB260 compact excavator has exceptional power, performance, working range and impressive feature set. The larger than average operator cabin is spacious and well appointed ensuring maximum operator comfort and efficiency for all day excavating. Maximum Digger Depth (3895mm) Attachment Ready -...
Single Drum Roller
Single Drum Roller Ideal for compacting large areas or hardcore, tarmac and asphalt. These machines are suitable for compaction in tight areas where a larger roller would unsuitable. Size 24 Hour Rate 2 Day Rate Week Rate POA POA £65.00
Double Extension Alloy Ladder
Double Extension Alloy Ladder Double extension alloy ladder – extends to 8m comprising two sections. Size 24 Hour Rate 2 Day Rate Week Rate £13 £18 £23
3.5 Tonne Plant Trailer
3.5 Tonne Plant Trailer Our twin axle trailers are purpose designed for the construction industry. Size 24 Hour Rate 2 Day Rate Week Rate £33.00 £44.00 £55.00
Strongboy
Strongboy A Strongboy is a steel support insert to be used in conjunction with steel props. Will act as a support for upper brickwork prior to the removal of lower brickwork. To install simply hammer into a mortar joint. Size 24 Hour Rate 2 Day...
Reviews